Non-Compliance detail


  
Summary
 
Licence number: 601
Annual Return Start: 01 Jun 2012
Annual Return End: 31 May 2013
Date Received: 30 Jul 2013
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L3.1 BOD & Total Suspended Solids exceeded limits due to aeration of STP & rainfall exceeding capacity of WMS. Simplified procedures with better clarity & settling pond to be lowered as much as reasonable prior to a rainfall event. PRP to address non-compliance(s) being negotiated 14
L4.1 Overflow from licenced discharge point exceeded daily limit due to WMS being @ capacity caused by rainfall events on or in the days preceeding. The settling pond shall be lowered as much as reasonably possible prior to a rainfall event. PRP to address non-compliance(s) being negotiated 8
M2.1 High Volume Air Sampler (HVAS) not operating on 4 specified dates due to an electrical fault, offsite for repairs. Unable to be repaired & replacement unit in transit. New HVAS unit purchased. EPA to monitor future compliance with this condition 4